• home
  • huts
  • cabin renovation
JMCS logo

The Cabin, Aug 2009

 

000-2009-08-01.jpg.small.jpeg
Cabin work meet.
23-25 August, 2009.

001-2009-08-02.jpg.small.jpeg


002-2009-08-03.jpg.small.jpeg
Patrick and Dave sorting out the drainage.

003-2009-08-04.jpg.small.jpeg
David heading up to sort out the chimney.

004-2009-08-05.jpg.small.jpeg
A well-earned lunch stop

005-2009-08-06.jpg.small.jpeg
The lunch time view.

006-2009-08-07.jpg.small.jpeg
The current state of the dining area.

007-2009-08-08.jpg.small.jpeg


008-2009-08-09.jpg.small.jpeg
Fred and Ruth having a tea break.

009-2009-08-10.jpg.small.jpeg
Alan looking a bit bemused, either by the lack of food or the excess of drink.

010-2009-08-11.jpg.small.jpeg


011-2009-08-12.jpg.small.jpeg


Produced 24 August 2009.